Study of the Interaction of the Railway Track and the Rolling Stock Under Conditions of Accelerated Movement

dc.contributor.authorHubar, Oleksіy V.en
dc.contributor.authorMarkul, Ruslan V.en
dc.contributor.authorTiutkin, Oleksii L.en
dc.contributor.authorAndrieiev, Volodymyr S.en
dc.contributor.authorArbuzov, Maximen
dc.contributor.authorKovalchuk, O.en
dc.date.accessioned2021-01-28T08:52:55Z
dc.date.available2021-01-28T08:52:55Z
dc.date.issued2020
dc.descriptionО. Hubar: ORCID 0000-0001-8683-5372; R. Markul: ORCID 0000-0002-7630-8963; О. Tiutkin: ORCID 0000-0003-4921-4758; V. Andrieiev: ORCID 0000-0002-0862-2790en
dc.description.abstractENG: Comprehensive studies of the interaction of the railway track and the investigated rolling stock under accelerated conditions have been carried out. The basis of the research was to obtain and substantiate the process of stress state, force interaction of the railway track and the rolling stock under conditions of accelerated movement. Introduction of the new rolling stock into continuous operation is a serious task that must be solved comprehensively. The implementation of this direction significantly affects the reliability of the elements of the railway track. Within the framework of the research, the approach was used that takes into account theoretical and experimental parts of the research using the methodology of prof. O. P. Yershkov. As a result of the studies, average stress values were established: in rails, they variate within the range 44.37...70.99 MPa; in the sleeper, they reach 0.78 MPa; in the ballast layer, they have 0.13 MPa; in the body of the subgrade, they reach 0.04 MPa, which is significantly less than the maxima allowable values. While speed change from 140 to 160 km/h, the values of the studied parameters decrease: vertical force (9.39 %), lateral forces (19.79 %); stresses in the edge of the rail flange (15.86 %); stresses in the edge of the rail head (16.67 %); stresses in the neck of the rail (8.74 %). The obtained results made it possible to form trends and recommendations on the feasibility of further increasing speeds development. At the same time, this made it possible to substantiate in more detail the operation of the railway track in the case of accelerated movement.en
dc.description.sponsorshipLaboratory of Engineering and Technical Studies, Dniprovsky Scientific Research Institute of Forensic Expertise, Dnipro, Ukraine; Laboratory of Railway Transport Research, Lviv Research Institute of Forensic Science, Lviv, Ukraineen
dc.identifierDOI: 10.1088/1757-899X/985/1/012007
dc.identifier.citationHubar O., Markul R., Tiutkin O., Andrieiev V., Arbuzov M., Kovalchuk O. Study of the Interaction of the Railway Track and the Rolling Stock Under Conditions of Accelerated Movement. IOP Conference Series: Materials Science and Engineering. 2020. Vol. 985 : 15th Intern. Sci. and Techn. Conf. "Problems of the railway transport mechanics" (PRTM 2020) 27–29 May 2020, Dnipro, Ukraine. Dnipro, 2020. DOI: 10.1088/1757-899X/985/1/012007.en
dc.identifier.issn1757-899X (Online)
dc.identifier.issn1757-8981 (Print)
dc.identifier.urihttp://eadnurt.diit.edu.ua/jspui/handle/123456789/12492
dc.identifier.urihttps://iopscience.iop.org/issue/1757-899X/985/1
dc.language.isoen
dc.publisherIOP Publishingen
dc.subjectrailwayen
dc.subjectrailway tracken
dc.subjectrolling stocken
dc.subjectКККГuk_UA
dc.subjectКПБДuk_UA
dc.subjectКМТuk_UA
dc.titleStudy of the Interaction of the Railway Track and the Rolling Stock Under Conditions of Accelerated Movementen
dc.typeArticleuk_UA
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Hubar_2020_IOP_Conf._985_012007.pdf
Size:
758.03 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: