Identification of the Railway Reconstruction Parameters at Imposition of High Speed Traffic on the Existing Lines

dc.contributor.authorLebid, Irynaen
dc.contributor.authorKravchenya, Irinaen
dc.contributor.authorDubrovskaya, Tatyanaen
dc.contributor.authorLuzhanska, Nataliiaen
dc.contributor.authorBerezovyi, Mykola I.en
dc.contributor.authorDemchenko, Yevhen B.en
dc.date.accessioned2019-11-19T11:41:50Z
dc.date.available2019-11-19T11:41:50Z
dc.date.issued2019
dc.descriptionM. Berezovyi: ORCID 0000-0001-6774-6737; Ye. Demchenko: ORCID 0000-0003-1411-6744en
dc.description.abstractENG: Abstract. The problems of railroad design technical reconstruction aimed at ensuring train protection in introduction of high-speed traffic on the rail lines have been addressed. The description of railroad technical system with certain specific features has been proposed. The pair of mutually dual problems regarding the optimal reconstruction of railway curves for raising train speeds at minimal capital investments has been addressed. The problem of determining the optimal speeds of trains of each category under optimum outer rail cant, increase of the unbalanced acceleration value, compliance with the condition of uniform load on rail tracks, comfortable carriage of passengers, in which reduced costs on increased speeds in curved tracks will be minimal has been formulated. To achieve the goals of the study, mathematical optimization techniques and algorithms of analysis of the rail lines of different nature are used. This, by finding and value engineering optimization, allows to minimize high-value and lengthy procedures of physical simulation. As a problem-solving technique, Lagrange multiplier method and its applicability have been proposed. Numeral solution to the problem of selection of certain stretches for increasing rolling stock speeds on operating lines without reconstruction or with minimum expenses on reconstruction of contour of track has been reviewed.en
dc.identifierDOI: 10.1051/matecconf/201929405003
dc.identifier.citationIdentification of the Railway Reconstruction Parameters at Imposition of High Speed Traffic on the Existing Lines [Electronic resource] / Iryna Lebid, Irina Kravchenya, Tatyana Dubrovskaya, Nataliia Luzhanska, Mykola Berezovyi, Yevhen Demchenko // MATEC Web of Conferences. – 2019. – Vol. 294 : 2nd International Scientific and Practical Conference “Energy-Optimal Technologies, Logistic and Safety on Transport” (EOT-2019). – P. 1–7. – DOI: 10.1051/matecconf/201929405003.en
dc.identifier.urihttp://eadnurt.diit.edu.ua/jspui/handle/123456789/11600en
dc.identifier.urihttps://www.matec-conferences.org/articles/matecconf/abs/2019/43/matecconf_eot18_05003/matecconf_eot18_05003.htmlen
dc.identifier.urihttps://www.matec-conferences.org/articles/matecconf/pdf/2019/43/matecconf_eot18_05003.pdfen
dc.language.isoen
dc.publisherDnipro National University of Railway Transport named after Academician V. Lazaryanen
dc.subjectrailway reconstruction parametersen
dc.subjecthigh speed trafficen
dc.subjectexisting linesen
dc.subjectКТВuk_UA
dc.titleIdentification of the Railway Reconstruction Parameters at Imposition of High Speed Traffic on the Existing Linesen
dc.typeArticleen
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Lebid.pdf
Size:
354.31 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: