Title: Identification of the Railway Reconstruction Parameters at Imposition of High Speed Traffic on the Existing Lines
Authors: Lebid, Iryna
Kravchenya, Irina
Dubrovskaya, Tatyana
Luzhanska, Nataliia
Berezovyi, Mykola I.
Demchenko, Yevhen B.
Keywords: railway reconstruction parameters
high speed traffic
existing lines
КТВ
Issue Date: 2019
Publisher: Dnipro National University of Railway Transport named after Academician V. Lazaryan
Citation: Identification of the Railway Reconstruction Parameters at Imposition of High Speed Traffic on the Existing Lines [Electronic resource] / Iryna Lebid, Irina Kravchenya, Tatyana Dubrovskaya, Nataliia Luzhanska, Mykola Berezovyi, Yevhen Demchenko // MATEC Web of Conferences. – 2019. – Vol. 294 : 2nd International Scientific and Practical Conference “Energy-Optimal Technologies, Logistic and Safety on Transport” (EOT-2019). – P. 1–7. – Access Mode: https://www.matec-conferences.org/articles/matecconf/pdf/2019/43/matecconf_eot18_05003.pdf (21.10.2019). – DOI: 10.1051/matecconf/201929405003.
Abstract: EN: Abstract. The problems of railroad design technical reconstruction aimed at ensuring train protection in introduction of high-speed traffic on the rail lines have been addressed. The description of railroad technical system with certain specific features has been proposed. The pair of mutually dual problems regarding the optimal reconstruction of railway curves for raising train speeds at minimal capital investments has been addressed. The problem of determining the optimal speeds of trains of each category under optimum outer rail cant, increase of the unbalanced acceleration value, compliance with the condition of uniform load on rail tracks, comfortable carriage of passengers, in which reduced costs on increased speeds in curved tracks will be minimal has been formulated. To achieve the goals of the study, mathematical optimization techniques and algorithms of analysis of the rail lines of different nature are used. This, by finding and value engineering optimization, allows to minimize high-value and lengthy procedures of physical simulation. As a problem-solving technique, Lagrange multiplier method and its applicability have been proposed. Numeral solution to the problem of selection of certain stretches for increasing rolling stock speeds on operating lines without reconstruction or with minimum expenses on reconstruction of contour of track has been reviewed.
Description: M. Berezovyi: ORCID 0000-0001-6774-6737, Ye. Demchenko: ORCID 0000-0003-1411-6744
URI: http://eadnurt.diit.edu.ua/jspui/handle/123456789/11600
https://www.matec-conferences.org/articles/matecconf/abs/2019/43/matecconf_eot18_05003/matecconf_eot18_05003.html
https://www.matec-conferences.org/articles/matecconf/pdf/2019/43/matecconf_eot18_05003.pdf
Other Identifiers: DOI: 10.1051/matecconf/201929405003
Appears in Collections:Статті КТВ
2nd International Scientific and Practical Conference “Energy-Optimal Technologies, Logistic and Safety on Transport” (EOT-2019)

Files in This Item:
File Description SizeFormat 
Lebid.pdf354,31 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.